Refined Proposal Timeline(2Finder)


2Finder: 2Finder is an integrated system, allowing app users to find restroom stalls near them that are free and open (hence "2" finder). The system will utilize the cloud connecting capabilities of the particle photon, and a force sensitive resistor toilet seat integration to accurate update an app. Below is a general timeline of the project markers.  


1. Begin the process of teammate search, and start design process. (Week of February 17th)

2. Start working on the prototype of the 2Finder, implementing the connection to the force sensitive resistor, and upload to cloud data. (Finish before March 1st).

3. Finalize design, begin research on app development, and user interface.

March 10th: Finalize/Present Concept

4. Begin implementation of app development, and integration with Photon cloud, and basic user interface. (March 10th - April 1st)

5. Finalize the app, prepare presentation material, work on a business plan and future integrations like smart transparent glass material.(April 1st - April 14th)